1 station · 8 total stalls.
Yes. Cloverdale, CA has 1 open Tesla Supercharger as of Nov 18, 2026: Penny Faire Plaza at 421 S Cloverdale Blvd, with 8 stalls at up to 500 kW.
Cloverdale ranks #308 of 345 California cities by Supercharger stalls (8 stalls here).
421 S Cloverdale Blvd, Cloverdale, CA, 95425
Open · Open to non-Tesla EVs · Opened Nov 16, 2026
| Stall power | Station | Model 3 / Y |
|---|---|---|
| 500 kW | Penny Faire Plaza | about 27–35 minutes |
Typical times for a Model 3 or Model Y Long Range with a warm battery, based on EV Database (checked Nov 10, 2026). These cars take up to 250 kW, so 325 kW and 500 kW stalls are not faster for them. Cold weather and busy sites add time. Estimate the time for your car.
Straight-line distance. Driving distance is longer.
Yes. Cloverdale, CA has 1 open Tesla Supercharger as of Nov 18, 2026: Penny Faire Plaza at 421 S Cloverdale Blvd, with 8 stalls at up to 500 kW.
On the 500 kW stalls here, a Model 3 or Model Y Long Range usually goes from 10% to 80% in about 27–35 minutes. A cold battery or a busy site can take longer. Older cars and other EVs vary.
Windsor, CA, about 21 miles away in a straight line: 8852 Lakewood Dr, with 12 stalls at up to 250 kW. Driving distance is longer.
Station data as of Nov 18, 2026.