1 station · 8 total stalls.
Yes. Spanish Fort, AL has 1 open Tesla Supercharger as of Nov 18, 2026: Cracker Barrel Old Country Store at 30227 Eastern Shore Ct, with 8 stalls at up to 325 kW.
Spanish Fort ranks #30 of 32 Alabama cities by Supercharger stalls (8 stalls here).
30227 Eastern Shore Ct, Spanish Fort, AL, 36527
Open · Open to non-Tesla EVs · Opened Nov 17, 2026
| Stall power | Station | Model 3 / Y |
|---|---|---|
| 325 kW | Cracker Barrel Old Country Store | about 27–35 minutes |
Typical times for a Model 3 or Model Y Long Range with a warm battery, based on EV Database (checked Nov 10, 2026). These cars take up to 250 kW, so 325 kW and 500 kW stalls are not faster for them. Cold weather and busy sites add time. Estimate the time for your car.
Straight-line distance. Driving distance is longer.
Yes. Spanish Fort, AL has 1 open Tesla Supercharger as of Nov 18, 2026: Cracker Barrel Old Country Store at 30227 Eastern Shore Ct, with 8 stalls at up to 325 kW.
On the 325 kW stalls here, a Model 3 or Model Y Long Range usually goes from 10% to 80% in about 27–35 minutes. A cold battery or a busy site can take longer. Older cars and other EVs vary.
Robertsdale, AL, about 11 miles away in a straight line: Buc-ee's at 20403 Co Rd 68, with 16 stalls at up to 250 kW. Driving distance is longer.
Station data as of Nov 18, 2026.